(iv) The plan shall list names, addresses, and phone numbers, of each person qualified to act as 24-hour emergency coordinator. This list shall be kept up to date. Where more than one person is listed, one shall be named as primary emergency coordinator and others shall be listed in the order that they will assume responsibility as alternates. See also Subsection R315-15-5.3(b)(5).(v) The plan shall include a list of each piece of emergency equipment at the facility, such as fire extinguishing systems, spill control equipment, communications and alarm systems, internal and external, and decontamination equipment, where this equipment is required. This list shall be kept up to date. In addition, the plan shall include the location and a physical description of each item on the list, and a brief outline of its capabilities.
(vi) The plan shall include an evacuation plan for facility personnel where there is a possibility that evacuation could be necessary. This plan shall describe signals to be used to begin evacuation, evacuation routes, and alternate evacuation routes, in cases where the primary routes could be blocked by releases of used oil or fires.
(3) Copies of contingency plan. A copy of the contingency plan and any revisions to the plan shall be:
(i) maintained at the facility; and
(ii) submitted to any local police departments, fire departments, hospitals, and state and local emergency response teams that may be called upon to provide emergency services.
(4) Amendment of contingency plan. The contingency plan shall be reviewed, and immediately amended, if necessary, when:
(i) applicable rules are revised;
(ii) the plan fails in an emergency;
(iii) the facility changes its design, construction, operation, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or releases of used oil, or changes the response necessary in an emergency;
(iv) the list of emergency coordinators changes; or
(v) the list of emergency equipment changes.
(5) Emergency coordinator. At any time, there shall be at least one employee either on the facility premises or on call, meaning available to respond to an emergency by reaching the facility within a short period, with the responsibility for coordinating emergency response measures. This emergency coordinator shall be thoroughly familiar with each aspect of the facility's contingency plan, each operation and activity at the facility, the location and characteristic of used oil handled, the location of any records within the facility, and facility layout. In addition, this person shall have the authority to commit the resources needed to carry out the contingency plan.
(6) Emergency procedures.
(i) When there is an imminent or actual emergency situation, the emergency coordinator, or the designee when the emergency coordinator is on call, shall immediately:
(A) activate internal facility alarms or communication systems, where applicable, to notify facility personnel; and
(B) notify appropriate state or local agencies with designated response roles if their help is needed.
(ii) When there is a release, fire, or explosion, the emergency coordinator shall immediately identify the character, exact source, amount, and areal extent of any released materials. The emergency coordinator may do this by observation or review of facility records or manifests and, if necessary, by chemical analyses.
(iii) Concurrently, the emergency coordinator shall assess possible hazards to human health and to the environment that may result from the release, fire, or explosion. This assessment shall consider both direct and indirect effects of the release, fire, or explosion, such as, the effects of any toxic, irritating, or asphyxiating gases that are generated, or the effects of any hazardous surface water run-offs from water or chemical agents used to control fire and heat-induced explosions.
(iv) If the emergency coordinator determines that the facility has had a release, fire, or explosion that could threaten human health, or the environment, outside the facility, the coordinator shall report the findings as follows:
(A) if the emergency coordinator assessment indicates that evacuation of local areas may be advisable, the emergency coordinator shall immediately notify appropriate local authorities. The coordinator shall be available to help appropriate officials decide whether local areas should be evacuated; and
(B) the emergency coordinator shall implement the actions as required in Section R315-15-9.
(v) During an emergency, the emergency coordinator shall take any reasonable measures necessary to ensure that fires, explosions, and releases do not occur, recur, or spread to other used oil or hazardous waste at the facility. These measures shall include, where applicable, stopping processes and operation, collecting and containing released used oil, and removing or isolating containers.
(vi) If the facility stops operation in response to a fire, explosion, or release, the emergency coordinator shall monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate.
(vii) Immediately after an emergency, the emergency coordinator shall provide for recycling, storing, or disposing of recovered used oil, contaminated soil or surface water, or any other material that results from a release, fire, or explosion at the facility.
(viii) The emergency coordinator shall ensure that, in the affected areas of the facility:
(A) No waste or used oil that may be incompatible with the released material is recycled, treated, stored, or disposed of until cleanup procedures are completed.
(B) Emergency equipment listed in the contingency plan is cleaned and fit for its intended use before operations are resumed.