modification is not applicable to dioxin-containing wastes, F020, 021, 022,
023, 026, 027, and 028)
b. That do not require the addition of units 11
or a change in the treatment process or
management standards, and provided that the
units have previously received wastes of
the same type, such as incinerator scrubber
water. This modification is not applicable
to dioxin-containing wastes, F020, 021,
022, 023, 026, 027, and 028
G. Tanks
1.
a. Modification or addition of tank units 3
resulting in greater than 25% increase in
the facility's tank capacity, except as
provided in G(1)(c), G(1)(d), and G(1)(e)
below
b. Modification or addition of tank units 2
resulting in up to 25% increase in the
facility's tank capacity, except as
provided in G(1)(d) and G(1)(e) below
c. Addition of a new tank that will operate 2
for more than 90 days using any of the
following physical or chemical treatment
technologies: neutralization, dewatering,
phase separation, or component separation
d. After prior approval of the Director, 11
addition of a new tank that will operate
for up to 90 days using any of the
following physical or chemical treatment
technologies: neutralization, dewatering,
phase separation, or component separation
e. Modification or addition of tank units or 11
treatment processes necessary to treat
wastes that are restricted from land
disposal to meet any of the
applicable treatment standards or to treat
wastes to satisfy, in whole or in part, the
standard of "use of practically available
technology that yields the greatest
environmental benefit," with prior
approval of the Director. This modification
may also involve addition of new waste codes.
It is not applicable to dioxin-containing
wastes, F020, 021, 022, 023, 026, 027,
and 028
2. Modification of a tank unit or secondary 2
containment system without increasing the
capacity of the unit
3. Replacement of a tank with a tank that meets 1
the design standards and has a capacity
within +/-10% of the replaced tank provided
-The capacity difference is no more than 1500
gallons,
-The facility's permitted tank capacity
is not increased, and
-The replacement tank meets the
conditions in the permit.
4. Modification of a tank management practice 2
5. Management of different wastes in tanks:
a. That require additional or different 3
management practices, tank design,
different fire protection specifications,
or significantly different tank treatment
process from that authorized in the permit,
except as provided in (G)(5)(c) below
b. That do not require additional or different 2
management practices, tank design, different
fire protection specifications, or
significantly different tank treatment
process than authorized in the permit,
except as provided in (G)(5)(d)
c. That require addition of units or change 11
in treatment processes or management