Regulatory Impact Summary Table
H. Department head comments on fiscal impact and approval of regulatory impact analysis:
The Executive Director of the Department of Natural Resources, Joel Ferry, has reviewed and approved this regulatory impact analysis.
Citation Information
7. Provide citations to the statutory authority for the rule. If there is also a federal requirement for the rule, provide a citation to that requirement:
Public Notice Information
9. The public may submit written or oral comments to the agency identified in box 1.
A. Comments will be accepted until:
10. This rule change MAY become effective on:
NOTE: The date above is the date the agency anticipates making the rule or its changes effective. It is NOT the effective date.
Agency Authorization Information
Agency head or
designee and title:
R649. Natural Resources; Oil, Gas and Mining; Oil and Gas.
R649-3. Drilling and Operating Practices.
R649-3-36. Shut-in, Inactive, and Temporarily Abandoned Wells. (1)[1.] Wells may be initially shut-in, inactive, or temporarily abandoned for a period of [twelve (]12[)] consecutive months. If a well is to be shut-in or temporarily abandoned for a period exceeding [twelve (]12[)] consecutive months, the operator shall file a Sundry Notice providing the following information: (a)[1.1.] Reasons for shut-in, inactive, or temporarily abandonment of the well[,]; (b)[1.2.] The length of time the well is expected to be shut-in, inactive, or temporarily abandoned[,]; and (c)[1.3.] An explanation and supporting data, for showing the well has integrity, meaning that the casing, cement, equipment condition, static fluid level, pressure, existence or absence of Underground Sources of Drinking Water and other factors do not make the well a risk to public health and safety or the environment. (2)[2.] After review the division will either approve the continued shut-in, inactive, or temporarily abandoned status or require remedial action to be taken to establish and maintain the well's integrity. (3)[3.] After five[ (5)] years of nonactivity or nonproductivity, the well shall be plugged in accordance with S[ubs]ection R649-3-24, unless approval for extended shut-in time is given by the division upon a showing of good cause by the operator. (4)[4.] If after a five[ (5)] year period the well is ordered plugged by the division, and the operator does not comply, the operator shall forfeit the drilling and reclamation bond and the well shall be properly plugged and abandoned under the direction of the division. KEY: oil and gas law
Date of Last Change: 2026[December 3, 2025] Notice of Continuation: June 30, 2025
Authorizing, and Implemented or Interpreted Law: 40-6-1 et seq.; 40-6-5; 40-6-20; 40-6-21
!--dar--