Notice of Emergency (120-Day) Rule | ||
Rule or section Number: | R156-15A-402 | Filing ID: 58328 |
Effective date: | 10/29/2026 |
1. Agency Information
Title catchline: | Commerce, Professional Licensing |
Building: | Heber M. Wells |
Street address: | 160 E 300 S |
City, state: | Salt Lake City, UT |
Mailing address: | PO Box 14671 |
City, state and zip: | Salt Lake City, UT 84114-6741 |
2. Contact Persons
Name: | Phone: | Email: |
Steve Duncombe | 801-530-6235 | sduncombe@utah.gov |
Please address questions regarding information on this notice to the persons listed above.
3. General Information
A. Rule or section catchline: |
R156-15A-402. Statewide Amendments to the International Energy Conservation Code
|
B. Purpose of the new rule or reason for the change: |
On 08/12/2026, following public testimony and deliberation, the Utah Uniform Building Code Commission voted unanimously (11 to 0, with two members absent) to recommend that three commercial energy management provisions of the International Energy Conservation Code (IECC) incorporated into the State Construction Code be repealed.
The Commission transmitted that recommendation to the Business and Labor Interim Committee on 09/01/2026, in the statutorily specified report required by Subsections 15A-1-204(5)(a) and 68-3-14(3), signed by Commission Chair W. Thomas Peterson on 08/27/2026.
The Legislature will not convene in general session until January 2027, and legislation implementing the Commission's recommendation could not take effect until later in 2027. The Commission determined, at its 09/09/2026 meeting, that under Subsection 15A-1-204(6)(a) waiting for legislative action in the next general session would cause an imminent peril to the public health, safety, or welfare.
This filing implements that determination by amending the State Construction Code, by rule, as Subsection 15A-1-204(6)(a) expressly authorizes the Commission to do in accordance with Title 63G, Chapter 3, the Utah Administrative Rulemaking Act.
|
C. Summary of the new rule or change: |
This filing amends Section R156-15A-401 to add statewide amendments to the IECC that delete three commercial energy management sections from the code as it applies in Utah: (1) IECC Section C405.12, which mandates automatic control of selected receptacles to shut off when spaces are unoccupied in commercial buildings;
(2) IECC Section C405.13, which mandates electrical service panel capacity, dedicated feeders, and raceway infrastructure for electric vehicle power transfer; and
(3) IECC Section C405.15, which mandates on-site renewable electricity generation sized at a minimum of 0.75 W/ft² across the three largest conditioned floors, or equivalent off-site renewable power procurement.
The amendment is limited to the three sections identified above. No other provision of the IECC, and no provision of any other code incorporated into the State Construction Code, is changed by this filing.
All building safety and core energy efficiency requirements of the IECC, including the building thermal envelope, mechanical, service water heating, and lighting provisions, remain in effect without change.
|
5. Emergency Rule Information
A. The agency finds that regular rulemaking would: | |
☒ | cause an imminent peril to the public health, safety, or welfare; |
☐ | cause an imminent budget reduction because of budget restraints or federal requirements; or |
☐ | place the agency in violation of federal or state law. |
B. Specific reasons and justifications for this finding: | |
Finding: Regular rulemaking would cause an imminent peril to the public health, safety, or welfare; see Subsection 15A-1-204(6)(a)(i) and Subsection 63G-3-304(1)(a).
Specific reasons and justifications: Cost of delay to housing and commercial affordability.
The Commission's 09/01/2026 report to the Business and Labor Interim Committee documents that the three provisions impose combined capital equipment and engineering costs of $10,500 to $33,000 per commercial building: 1) $5,000 to $15,000 per building for sub-meters, current transformers, wiring, data gateways, and commissioning under C405.12;
2) $3,000 to $10,000 per building for oversized electrical panels, conduits, and service capacity under C405.13; and
3) $2,500 to $8,000 per project for photovoltaic arrays, inverters, specialized engineering, or long-term off-site power purchase agreements under C405.15.
Every commercial building permitted between the date of this filing and the effective date of any 2027 legislation would incur those costs irreversibly, because the affected systems are installed during construction and cannot be economically removed afterward.
The harm cannot be remedied later. Legislation adopted in the 2027 General Session would take effect prospectively and would not relieve projects permitted in the interim.
Building permits issued during the interval would lock in requirements the Commission has determined do not deliver commensurate benefit under Utah's regulatory framework, and the resulting expenditures cannot be recovered.
Regular rulemaking is not a timely alternative. The Commission acted on 08/12/2026, and its report was transmitted 09/01/2026. The next general session does not convene until January 2027. Regular rulemaking under Section 63G-3-301 would not conclude before a substantial volume of commercial permits is issued for the 2026-2027 construction cycle.
Narrow scope; no reduction in life-safety protection. The amendment deletes three energy management provisions only. It does not alter any structural, fire, electrical, mechanical, plumbing, or means-of-egress requirement, and it does not alter the IECC's building thermal envelope or equipment efficiency requirements. The Commission found no adverse effect on building safety.
Procedural record. The recommendation was developed on the Commission's own initiative following feedback from recognized construction-related associations and local code regulators, as authorized by Subsection 15A-1-204(5)(b), and was adopted after public testimony at the Commission's 08/12/2026 public meeting by a unanimous 11 to 0 vote.
Statutorily required companion filings. Under Subsection 15A-1-204(6)(b), the Commission has filed with the Division of Professional Licensing (Division) the text of this amendment and this analysis of the specific reasons and justifications for its findings.
Under Subsection 15A-1-204(6)(c), the Division will publish the amendment in accordance with Section 15A-1-205 and will submit written notice of the amendment, including a copy of this analysis, to the Business and Labor Interim Committee in accordance with Section 68-3-14.
Under Subsection 63G-3-304(2)(b), the information required by Subsection 63G-3-304(2)(a) is being provided to the members of the General Oversight Committee concurrently with this filing.
Duration. Under Subsection 63G-3-304(2)(e), this rule is effective for a period not exceeding 120 days from the date of filing.
Under Subsection 15A-1-204(6)(d), if the amendment is not formally adopted by the Legislature at the next annual general session, it is repealed on July 1 immediately following that session. If the Commission intends the amendment to remain effective beyond 120 days, it will also comply with the procedures of Section 63G-3-301.
| |
6. Fiscal Information
Provide an estimate and written explanation of the aggregate anticipated cost or savings to: |
A. State budget: |
No fiscal impact to the state budget.
The Commission's report identifies the state budget impact of each of the three repeals as $0 (neutral).
The Division anticipates a one-time administrative cost of less than $500 to update state guidance materials, including the Commercial Energy Code quick reference guidance, which is absorbed within existing appropriations.
The State Construction Code is administered by the Division under Section 15A-1-205, which does not assign the Division responsibility to conduct inspections, issue permits, or assess building permit fees, so no state enforcement cost changes.
|
B. Local governments: |
Cost savings, amount not determinable in the aggregate.
Local governments act as compliance agencies and perform plan review and field inspection of the affected provisions.
Removing the three provisions decreases electrical plan review scope and eliminates review of sub-metering, EV infrastructure, and renewable system documentation, along with associated third-party commissioning verification.
The per-jurisdiction savings depend on commercial permit volume and staffing model and cannot be reliably quantified statewide.
No local government will incur a new cost, and no local government is required to take any action as a result of this filing.
|
C. Small businesses ("small business" means a business employing 1-49 persons): |
Cost savings of $10,500 to $33,000 per commercial building for small businesses that construct, develop, or own newly constructed commercial buildings in Utah.
The savings consist of $5,000 to $15,000 per building in sub-metering hardware and commissioning, $3,000 to $10,000 per building in electrical service capacity and EV raceway infrastructure, and $2,500 to $8,000 per project in renewable energy equipment, engineering, or off-site procurement contracting.
Small business electrical contractors, mechanical contractors, and design professionals may experience a corresponding reduction in revenue from work associated with these three provisions; the aggregate amount is not determinable because it depends on future commercial construction volume and on how many owners continue to install these systems voluntarily.
|
D. Persons other than small businesses, state, or local government entities ("person" means any individual, partnership, corporation, association, governmental entity, or public or private organization of any character other than an agency): |
Cost savings of $10,500 to $33,000 per commercial building for persons other than small businesses, state, or local government entities that construct, develop, or own newly constructed commercial buildings in Utah, on the same cost components described in Box 6C.
Building owners who elect to install energy monitoring, EV infrastructure, or on-site renewable generation may continue to do so; this filing removes the mandate, not the option.
Owners who defer EV infrastructure and later add EV charging may incur higher per-unit retrofit costs than if conduit and capacity had been installed during original construction, and owners who do not voluntarily install these systems will not have mandatory operational energy data tracking or baseline renewable capacity.
|
E. Compliance costs for affected persons: |
No compliance cost.
This filing imposes no new requirement on any person. It removes three existing mandatory requirements, so an affected person's cost of adhering to the State Construction Code decreases by the amounts described in Boxes 5C and D.
No person is required to modify an existing building, retrofit an installed system, submit any filing, or obtain any approval as a result of this amendment.
|
F. Comments by the department head on the fiscal impact this rule may have on businesses (Include the name and title of the department head): |
This emergency amendment reduces the cost of commercial construction in Utah by an estimated $10,500 to $33,000 per building without reducing building safety or the core energy efficiency requirements of the adopted code.
Businesses that construct or own commercial buildings, including small businesses, will benefit from lower upfront capital costs, reduced design and inspection overhead, and restored flexibility to make energy investments based on financial return.
Contractors and design professionals whose work relates specifically to the three repealed provisions may see a corresponding reduction in that scope of work.
The filing imposes no new compliance obligation on any business.
On 09/09/2026, the Uniform Building Code Commission unanimously accepted the proposed changes to the Utah Uniform Building Code.
The Commission determined that waiting for legislative action to codify these changes would cause imminent peril to public health, safety, or welfare within the meaning of Subsection 15A-1-204(6) and acted on an emergency basis.
Under Subsection 15A-1-204(6)(c), the Division is required to publish this amendment. The statute grants neither Division nor the Commissioner, Margaret Busse, authority to alter the Commission's recommendation.
Nevertheless, for purposes of this filing, the Commissioner has reviewed this fiscal impact summary and believes it to accurately reflect the potential fiscal impacts of the Commission's changes. Margaret W. Busse, Commissioner of the Department of Commerce
|
7. Citation Information
Provide citations to the statutory authority for the rule. If there is also a federal requirement for the rule, provide a citation to that requirement: | ||
Subsection 58-1-106(1)(a) | Subsection 58-1-202(1)(a) | Subsection 15A-1-204(6) |
Section 15A-1-205 |
|
|
9. Agency Authorization Information
Agency head or designee and title: | Adam Watson, Assistant Division Director | Date: | 10/06/2026 |
R156. Commerce, Professional Licensing.
R156-15A. State Construction Code Administration and Adoption of Approved State Construction Code Rule.
R156-15A-402. Statewide Amendments to the International Energy Conservation Code.
Under Subsection 15A-1-204(6)(a), the commission determined that waiting for legislative action in the next general legislative session would cause an imminent peril to the public health, safety, or welfare, the following are adopted as amendments to the IECC to be applicable statewide:
(1) In IECC, Section C405.12 is deleted.
(2) In IECC, Section C405.13 is deleted.
(3) In IECC, Section C405.15 is deleted.
KEY: contractors, building codes, building inspections, licensing
Date of Last Change: [November 7, 2024]October 29, 2026
Notice of Continuation: April 13, 2026
Authorizing, and Implemented or Interpreted Law: 58-1-106(1)(a); 58-1-202(1)(a); 15A-1-204(6); 15A-1-205
!--dar--