(1) No person shall transfer or permit the transfer of gasoline from any gasoline cargo tank into any stationary storage container with a capacity of 250 gallons or greater unless such container is equipped with a submerged fill pipe that extends to no more than 12 inches from the bottom of the storage tank for fill pipes installed on or before November 9, 2006, and no more than six inches from the bottom of the storage tank for fill pipes installed after November 9, 2006, and at least 90% of the gasoline vapor, by weight, displaced during the filling of the stationary storage container is prevented from being released to the atmosphere. This requirement shall not apply to:(a) the transfer of gasoline into any stationary storage container of less than 550 gallons used primarily for the fueling of implements of husbandry if such container is equipped with a permanent submerged fill pipe;
(b) the transfer of gasoline into any stationary storage container having a capacity of less than 2,000 gallons which was installed before January 1, 1979, if such container is equipped with a permanent submerged fill pipe; or
(c) the transfer of gasoline to storage tanks equipped with floating roofs or their equivalent which have been approved by the director.
(2) The 90% performance standard of the vapor control system shall be based on operating procedures and equipment specifications. The design effectiveness of such equipment and the operating procedure must be documented and submitted to and approved by the director.
(3) Each owner or operator of a gasoline storage tank or the owner or operator of the gasoline cargo tank subject to Subsection (1) shall install vapor control equipment, which includes:
(a) vapor return lines and connections sufficiently free of restrictions to allow transfer of vapor to the gasoline cargo tank or to the vapor control system, and to achieve the required recovery;
(b) a means of assuring that the vapor return lines are connected to the gasoline cargo tank, or vapor control system, and storage tank during tank filling;
(c) restrictions in the storage tank vent line designed and operated to prevent:
(i) the release of gasoline vapors to the atmosphere during normal operation; and
(ii) gauge pressure in the gasoline cargo tank from exceeding 18 inches of water and vacuum from exceeding 6 inches of water; and
(d) a pressure vacuum relief valve on the vent line of each storage tank that:
(i) is set to open at eight oz. per square inch or greater pressure and four oz. per square inch or greater vacuum; and
(ii) is tested initially and every three years thereafter using the California Air Resources Board Test Procedure 201.1E.
(e) Test records shall be submitted to the director.
R307-328-6. Gasoline Cargo Tank.
(1) Gasoline cargo tanks must be designed and maintained to be vapor tight during loading and unloading operations as well as during transport, except for normal pressure venting required under United States Department of Transportation Regulations.
(2) The design of the vapor recovery system shall be such that when the gasoline cargo tank is connected to an approved storage tank vapor recovery system or loading terminal, 90% vapor recovery efficiencies are realized. The connectors of the gasoline cargo tanks shall be compatible with the fittings on the fill pipes and vapor vents at the storage containers and gasoline loading terminals where the gasoline cargo tank will service or be serviced. Adapters may be used to achieve compatibility.
(3) No person shall knowingly allow the introduction of gasoline into, dispensing of gasoline from, or transportation of gasoline in a gasoline cargo tank that does not meet the leak tight testing requirements of Section R307-328-7.
(4) A vapor-laden gasoline cargo tank may be refilled only at installations equipped to recover, process, or dispose of vapors. Gasoline cargo tanks that only service locations with storage containers specifically exempted from the requirements of Section R307-328-5 need not be retrofitted to comply with Subsections R307-328-6(1) through (3), provided such gasoline cargo tanks are loaded through a submerged fill pipe or equivalent equipment provided the design and effectiveness of such equipment are documented and submitted to and approved by the director.
R307-328-7. Vapor Tightness Testing.
(1) Gasoline cargo tanks and their vapor collection systems shall be tested annually for leakage in accordance with the test methods and vapor tightness standards in 40 CFR 63.425(e) which are incorporated by reference.
(2) Each owner or operator of a gasoline cargo tank shall have documentation in their possession demonstrating that the gasoline cargo tank has passed the annual test in Subsection (1) within the preceding 12 months.
(3) The vapor tightness documentation described in Subsection (2), as well as record of any maintenance performed, shall be retained by the owner or operator of the gasoline cargo tank for a two-year period and be available for review by the director or the director's representative.
(4) The owner or operator of a railcar gasoline cargo tank may use the testing, recordkeeping, and reporting requirements in 40 CFR 63.425(i), which is incorporated by reference as an alternative to the annual testing requirements in Subsections (1) through (3).
R307-328-8. Alternate Methods of Control.
(1) Any person may apply to the director for approval of an alternate test method, an alternate method of control, an alternate compliance period, an alternate emission limit, or an alternate monitoring schedule. The application must include a