(I) If the cloth used to wipe a particular surface section does not match the cleaning verification card, re-clean that section of the surface as directed in Subsections R307-841-5(1)(e)(ii)(B) and R307-841-5(1)(e)(ii)(C), then use a new wet disposable cleaning cloth to wipe that section again. If the cloth matches the cleaning verification card, that section of the surface has been adequately cleaned.(II) If the cloth used to wipe a particular surface section does not match the cleaning verification card after the surface has been re-cleaned, wait for one hour or until the entire surface within the work area has dried completely, whichever is longer.
(III) After waiting for the entire surface within the work area to dry, wipe each section of the surface that has not yet achieved post-renovation cleaning verification with a dry disposable cleaning cloth. After this wipe, that section of the surface has been adequately cleaned.
(iii) If the work area passes the post-renovation cleaning verification, remove the warning signs.
(b) Exteriors. A certified renovator must perform a visual inspection to determine whether dust, debris, or residue is still present on surfaces in and below the work area, including windowsills and the ground. If dust, debris, or residue is present, these conditions must be eliminated and another visual inspection must be performed. If the area passes the visual inspection, remove the warning signs.
(3) Optional dust clearance testing. Cleaning verification need not be performed if the contract between the renovation firm and the person contracting for the renovation or another federal, state, territorial, tribal, or local law or regulation requires:
(a) The renovation firm to perform dust clearance sampling at the conclusion of a renovation covered by this rule.
(b) The dust clearance samples are required to be collected by a certified inspector, risk assessor, or dust sampling technician.
(c) The renovation firm is required to re-clean the work area until the dust sample results are below the dust-lead action levels in Section R307-840-2 or any local standard.
(4) Activities conducted after post-renovation cleaning verification. Activities that do not disturb paint, such as applying paint to walls that have already been prepared, are not regulated by this rule if they are conducted after post-renovation cleaning verification has been performed.
R307-841-6. Recordkeeping and Reporting Requirements.
(1) Firms performing renovations must retain and, if requested, make available to the director all records necessary to demonstrate compliance with this rule for a period of three years following completion of the renovation. This three-year retention requirement does not supersede longer obligations required by other provisions for retaining the same documentation.
(2) Records that must be retained pursuant to Subsection R307-841-6(1) shall include where applicable:
(a) Records or reports certifying that a determination had been made that lead-based paint is not present on the components affected by the renovation, as described in Subsection R307-841-3(1). These records or reports include:
(i) Reports prepared by a certified inspector or certified risk assessor certified pursuant to Section R307-842-2.
(ii) Records prepared by a certified renovator after using EPA-recognized test kits, including an identification of the manufacturer and model of any test kits used, a description of the components that were tested including their locations, and the result of each test kit used.
(iii) Records prepared by a certified renovator after collecting paint chip samples, including a description of the components that were tested including their locations, the name and address of the NLLAP-recognized entity performing the analysis, and the results for each sample.
(b) Signed and dated acknowledgments of receipt as described in Subsections R307-841-4(1)(a)(i), R307-841-4(1)(b)(i), R307-841-4(2)(a)(i), R307-841-4(3)(a)(i), and R307-841-4(3)(b)(i).
(c) Certifications of attempted delivery as described in Subsections R307-841-4(1)(b)(i) and R307-841-4(3)(b)(i).
(d) Certificates of mailing as described in Subsections R307-841-4(1)(a)(ii), R307-841-4(1)(b)(ii), R307-841-4(2)(a)(ii), R307-841-4(3)(a)(ii), and R307-841-4(3)(b)(ii).
(e) Records of notification activities performed regarding common area renovations, as described in Subsections R307-841-4(2)(c) and R307-841-4(2)(d), and renovations in child-occupied facilities, as described in Subsection R307-841-4(3)(c).
(f) Documentation of compliance with the requirements of Section R307-841-5, including documentation that a certified renovator was assigned to the project, that the certified renovator provided on-the-job training for workers used on the project in a language that the workers can comprehend, that the certified renovator performed or directed workers who performed all the tasks described in Subsection R307-841-5(1), and that the certified renovator performed the post-renovation cleaning verification described in Subsection R307-841-5(2). If the renovation firm was unable to comply with all the requirements of Rule R307-841 due to an emergency as defined in Section R307-841-3, the firm must document the nature of the emergency and the requirements that were not followed. This documentation must include a copy of the certified renovator's current Utah Lead-Based Paint Renovator certification card, and a certification by the certified renovator assigned to the project that:
(i) Training was provided to workers. Topics must be identified for each worker.
(ii) Warning signs were posted at the entrances to the work area.
(iii) If test kits were used, that the specified brand of kits was used at the specified locations and that the results were as specified.
(iv) If paint chip samples were collected, that the samples were collected at the specified locations, that the specified NLLAP-recognized laboratory analyzed the samples, and that the results were as specified.
(v) The work area was contained by:
(A) Removing or covering all objects in the work area for interiors;