"Inaccessible" means in a physically restricted or obstructed area, or covered in a way that detection or removal is prevented or severely hampered."Inspector" means a person who is certified according to Section R307-801-6, conducts asbestos inspections, or oversees the preparation of asbestos inspection reports.
"Libby Amphibole" means loose-fill vermiculite type insulation material originating in Libby, Montana, or elsewhere, used in regulated facilities subject to this rule and has greater than 1% asbestiform varieties of serpentine (chrysotile), riebeckite (crocidolite), cummingtonite-grunerite (amosite), anthophyllite, and actinolite-tremolite, as defined earlier in this section, and winchite, richterite, tremolite, magnesio-riebikite, magnesio-arfvedsonite, and edenite using United States Environmental Protection Agency Method EPA/600/R93/116 or other method as approved by the director.
"Management Plan" means a document that meets the requirements of AHERA for management plans for asbestos in schools.
"Management Planner" means a person who is certified according to Section R307-801-6 and oversees the preparation of management plans for school buildings subject to AHERA.
"Model Accreditation Plan (MAP)" means 40 CFR Part 763, Subpart E, Appendix C, Asbestos Model Accreditation Plan.
"NESHAP Amount" means combined amounts in a project that total:
(a) 260 linear feet (80 linear meters) of pipe covered with RACM;
(b) 160 square feet (15 square meters) of RACM used to cover or coat any duct, boiler, tank, reactor, turbine, equipment, structural member, or regulated facility component; or
(c) 35 cubic feet (one cubic meter) of RACM removed from regulated facility structural members or components where the length and area could not be measured previously.
"NESHAP Facility" means any institutional, commercial, public, industrial, or residential structure, installation, or building, including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential co-operative, but excluding residential buildings having four or fewer dwelling units; any ship; and any active or inactive waste disposal site. For purposes of this definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building. Any structure, installation, or building that was previously subject to the Asbestos NESHAP is not excluded, regardless of its current use or function. Any structure, installation, or building that will be subject to the Asbestos NESHAP is not excluded, regardless of its current use or function.
"NESHAP-Sized Project" means any project that involves at least the NESHAP amount of ACM.
"Non-Friable Asbestos-Containing Material" means any material containing more than 1% asbestos, as determined using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM), that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
"Open Top Catch Bag" means either an asbestos waste bag or six mil polyethylene sheeting which is sealed at both ends and used by certified asbestos abatement workers, in a manner not to disturb the matrix of the asbestos-containing material, to collect preformed RACM pipe insulation in either a crawl space or pipe chase less than six feet high or less than three feet wide.
"Phased Project" means either an asbestos abatement, renovation, or demolition project that contains multiple start and stop dates corresponding to separate operations or areas where the entire asbestos abatement, renovation, or demolition project cannot or will not be performed continuously.
"Preformed RACM Pipe Insulation" means prefabricated asbestos-containing thermal system insulation on pipes formed in sections that can be removed without disturbing the matrix of the asbestos-containing material.
"Project Designer" means a person who is certified according to Section R307-801-6 and prepares a design for an asbestos abatement project in school buildings subject to AHERA or prepares an asbestos clean-up plan in a regulated facility where an asbestos disturbance greater than the SSSD amount has occurred.
"Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
"Regulated Facilities" means residential facilities, AHERA facilities, or NESHAP facilities where demolition, renovation, or general remodeling activities will occur, including facilities where:
(a) A sample has been identified and analyzed to contain, or is assumed under Subsection R307-801-10(5) to contain, greater than 1% asbestos and the material from where the sample was collected will be disturbed and rendered friable; or
(b) No asbestos-containing materials have been identified.
"Regulated Facility Component" means any part of a regulated facility including equipment.
"Renovation Project" means any activity involving the removal, repair, salvage, disposal, cleanup, or other disturbance of greater than the SSSD amount of RACM, but less than the NESHAP amount of RACM, and the intent of the project is not asbestos abatement or demolition. Renovation Projects may be performed in NESHAP or residential facilities, but cannot be performed in AHERA facilities.
"Renovator" means a person who is certified according to Section R307-801-6 and is responsible for ensuring work that is conducted on a renovation project is performed in accordance with the regulatory requirements and best work practices for a greater than the SSSD amount of RACM, but less than the NESHAP amount of RACM, where the intent of the project is to